I've framed the closet in the bedroom, I have two windows in the bedroom to finish trimming out! Plus the extension of the return air duct.  Then I have 3 ceiling panels in the bedroom and I'm finished with the ceiling.  The next thing on the list is sanding walls, then seizing them for the wall paper, after that its time to lay the tile.   I've got all of the trim wood and need to make a trip to Cincinnati for the cabinet grade plywood.
Posted by Picasa

Popular Posts